File:2020-11-28 11.23.54.jpg: Difference between revisions

From IBLS
Jump to navigation Jump to search
(Step 1: ties are placed in the jig with pre-curved aluminum rail on top. Track screws are started but not tightened in this step. Photo by Daris A Nevil, November 2020.)
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Step 1: ties are placed in the jig with pre-curved aluminum rail on top. Track screws are started but not tightened in this step.  Photo by Daris A Nevil, November 2020.
Step 1: ties are placed in the jig with pre-curved aluminum rail on top. Photo by Daris A Nevil, November 2020.

Latest revision as of 17:31, 29 November 2020

Step 1: ties are placed in the jig with pre-curved aluminum rail on top. Photo by Daris A Nevil, November 2020.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:20, 29 November 2020Thumbnail for version as of 17:20, 29 November 20203,024 × 4,032 (5.19 MB)Dnevil (talk | contribs)
17:18, 29 November 2020Thumbnail for version as of 17:18, 29 November 20204,032 × 3,024 (5.19 MB)Dnevil (talk | contribs)Step 1: ties are placed in the jig with pre-curved aluminum rail on top. Track screws are started but not tightened in this step. Photo by Daris A Nevil, November 2020.

The following page uses this file:

Metadata