File:ToadSwampAndPunkHollowRR GoldenSpike.jpg

From IBLS
Jump to navigation Jump to search

Original file(1,024 × 794 pixels, file size: 443 KB, MIME type: image/jpeg)

The golden spike… July 17, 1938. Fred Jerome, Pres. of TSME, wields the hammer, A.W. Leggett stands to his left. Billy Leggett Jr. is behind the engineer running Fred's Timken "Four Aces" 4-8-4.

This track was the third of five layouts at four different locations for the T.S. & P.H. RR.

The track in the photo is the first elevated track built. It was originally on the ground, straight up and down the side of the rented house on Curzon Avenue in St-Lambert and began service in 1932 or a bit earlier.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:03, 24 November 2013Thumbnail for version as of 16:03, 24 November 20131,024 × 794 (443 KB)Dnevil (talk | contribs)The golden spike… July 17, 1938. Fred Jerome, Pres. of TSME, wields the hammer, A.W. Leggett stands to his left. Billy Leggett Jr. is behind the engineer running Fred's Timken "Four Aces" 4-8-4. This track was the third of five layouts at four diffe...

The following page uses this file:

Metadata