Diamond: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[Category:Right of Way]] | [[Category:Right of Way]] | ||
== Examples == | |||
=== CIG === | |||
Ken Smith built this [[Diamond|diamond]] for the [[Comanche & Indian Gap Railroad]]. He used flat bar for all components, with the exception of the short section of steel rail as a transition between the diamond and the aluminum rail. | |||
<gallery widths=300px heights=300px perrow=2> | |||
File:CIGRR Diamond 2020-10-16 18.15.16.jpg | |||
File:CIGRR Diamond 2020-10-16 18.15.21.jpg | |||
File:CIGRR Diamond 2020-10-16 18.15.23.jpg | |||
File:CIGRR Diamond 2020-10-16 18.15.27.jpg | |||
File:CIGRR Diamond 2020-10-16 18.15.33.jpg | |||
File:CIGRR Diamond 2020-10-16 18.15.41.jpg | |||
File:CIGRR Diamond 2020-10-16 18.15.57.jpg | |||
File:CIGRR Diamond 2020-10-16 18.16.00.jpg | |||
File:CIGRR Diamond 2020-10-16 18.16.06.jpg | |||
File:CIGRR Diamond 2020-10-16 18.16.20.jpg | |||
File:CIGRR Diamond 2020-10-16 18.16.23.jpg | |||
File:CIGRR Diamond 2020-10-17 11.11.05.jpg | |||
File:CIGRR Diamond 2020-10-18 07.32.18.jpg | |||
File:CIGRR Diamond 2020-10-18 07.32.25.jpg | |||
</gallery> | |||
== External Links == | == External Links == | ||
* [https://discoverlivesteam.com/2015/04/12/constructing-a-diamond-junction/ "Constructing a Diamond Junction", <i>DiscoverLiveSteam.com</i>] | * [https://discoverlivesteam.com/2015/04/12/constructing-a-diamond-junction/ "Constructing a Diamond Junction", <i>DiscoverLiveSteam.com</i>] |
Revision as of 09:26, 26 May 2021
Examples
CIG
Ken Smith built this diamond for the Comanche & Indian Gap Railroad. He used flat bar for all components, with the exception of the short section of steel rail as a transition between the diamond and the aluminum rail.